Determining the Initial Gap Distribution (Short-Term Statistics)
main topic
  

See the notation used in the equations below:

Short-term statistics

mGap,ST

=

S mi Ci Vi Ni  

Short-term gap mean before allocation

sGap,ST

=

image\EQU1.gif

Short-term gap standard deviation before allocation

Z.LSL(ST)

=

=

=

(T - LSL) / sGap,ST
'*'
T / sGap,ST

If only lower specification on the assembly gap is given

If only upper specification in the assembly gap is given

If neither lower nor upper specification in the assembly gap

Z.USL(ST)

=

=

(USL- T) / sGap,ST
'*'

If only upper specification on the assembly gap is given

Otherwise

Z.BenchGap,ST

=

=

=

F-1(F(Z.USL(ST)) - (F(-Z.LSL(ST)))

Z.USL(ST)

Z.LSL(ST)

If neither lower nor upper specification in the assembly gap

If only upper specification in the assembly gap is given

Otherwise

For corresponding calculations for long-term statistics, see Determining the initial gap distribution (long-term statistics).