Xbar-R ChartTest Results - R Chart |
R charts assess whether the process variation is in control. The tests for special causes detect points beyond the control limits and specific patterns in the data plotted on the chart.
chart. A failed point indicates that there is
a nonrandom
pattern in the data that may be the result of special-cause variation.
These points should be investigated.
The R chart must be in control before you can interpret the chart. If the R chart is not in control, then the control
limits for the
chart will be inaccurate and may inappropriately
signal an out of control
condition on the
chart.
Example Output |
TEST 1. One point more than 3.00 standard deviations from center line. Test Failed at points: 8
TEST 5. 2 out of 3 points more than 2 standard deviations from center line (on one side of CL). Test Failed at points: 17
TEST 6. 4 out of 5 points more than 1 standard deviation from center line (on one side of CL). Test Failed at points: 12, 13, 19, 20 |
Interpretation |
The camshaft data did not fail any of the tests for special causes.
Therefore, the R chart is in control and it is appropriate to examine