MrWu
发表于 2024-9-5 07:42:10
学习
saber11
发表于 2024-9-5 08:00:59
谢谢分享
kolaghj
发表于 2024-9-5 08:03:53
学习了
pangdudu
发表于 2024-9-5 08:07:21
{:1_180:}
Tiger-1
发表于 2024-9-5 08:14:28
{:1_180:}
badboy0133
发表于 2024-9-5 08:54:50
感謝分享
精致品质_22
发表于 2024-9-6 11:34:10
{:1_180:}{:1_180:}
Jessicachaung
发表于 2024-10-14 11:18:38
:)
flyerchang
发表于 2024-10-14 16:28:30
谢谢分享
臭要饭的
发表于 2024-12-30 22:58:26
我编辑整理的(局部)
4 Management of the design review process
4 设计评审过程的管理
4.1 General recommendations
4.1 一般性建议
The organization should establish and maintain a management system to direct and control those design review activities
that are part of the organization’s overall management system.
组织应当建立并保持一套管理系统,以指挥和控制那些属于组织整体管理体系一部分的设计评审活动。
For designs reviews this should include:
设计评审应当包括以下内容:
a) identifying the functions and activities needed for the organization’s design reviews;
确定组织设计评审所需的职能和活动;
b) establishing the design review objectives and plan to achieve these objectives during design planning;
在设计规划期间确定设计评审目标和实现这些目标的计划;
c) ensuring timely implementation of the design review activities during all applicable design phases;
确保在所有适用的设计阶段及时开展设计评审活动;
d) assessing the criteria and methods for performance assessment, evaluation and acceptance of the product;
评估产品性能评估、评价和接收的标准和方法;
e) providing resources and information necessary to achieve required design reviews;
提供必要的资源和信息,以实现所需的设计评审;
f) monitoring the design review activities and, measuring and analysing the results for continual improvement.
监视设计评审活动,并对结果进行测量和分析,以持续改进。