blueboat 发表于 2025-12-30 16:25:48

GP-9 GENERAL MOTORS RUN@RATE

GENERAL MOTORS RUNRATE GP-9.pdf

I. PURPOSE
The purpose of a Run @ Rate is to verify:
A. the supplier's actual manufacturing process is capable of producing components that meet GM's on-goingquality requirements, as stated in the Production Part Approval Process (PPAP), at quoted tooling capacity for a specified period of time; and B. the supplier's actual manufacturing process conforms to the manufacturing and quality plan documentedby the supplier in PPAP, GP-12 and other required documentation. During a Run @ Rate, all production tooling is to be in place and running at full capacity, utilizing all regular production, direct and indirect, personnel and support systems.

II. SCOPE
All new parts require a Run @ Rate, unless exempted by the supplier quality engineer and approved by theSupplier Quality and Purchasing Directors of the procuring division.

neil0404 发表于 2025-12-31 07:39:39

谢谢分享

汽车质量 发表于 2025-12-31 07:51:40

谢谢

saber11 发表于 2025-12-31 07:56:35

谢谢分享

ghostgunner1230 发表于 2025-12-31 08:04:16

谢谢分享

cht6688 发表于 2025-12-31 08:17:17

感谢分享

lavinhaim2099 发表于 2025-12-31 08:20:18

感谢分享

有缘结识品质 发表于 2025-12-31 08:33:47

谢谢分享

zenghuan555 发表于 2025-12-31 08:51:43

感谢分享

keke19880517 发表于 2025-12-31 08:54:54

:)
页: [1] 2 3
查看完整版本: GP-9 GENERAL MOTORS RUN@RATE