审核组长 | | 组员 | |
审核员 | 审核时间 | 审核部门 | 审核内容 |
| 5月11,8:30-12:00 | 总经理及管代 | ISO14001:4.1/4.2/4.3/4.4/5.1/5.2/5.3/7.1/9.3 |
| 仓库 | ISO14001:5.3/6.1.1/6.1.2/6.2.1/6.2.2/7.4/8.1/8.2/10.2 |
| 技术部 | ISO14001:5.3/6.1.1/6.1.2/6.2.1/6.2.2/7.4/8.1/8.2/10.2 |
| 生产部 | ISO14001:5.3/6.1.1/6.1.2/6.2.1/6.2.2/7.4/8.1/8.2/10.2 |
| 13:30-17:00 | 质管部 | ISO14001:5.3/6.1.1/6.1.2/6.2.1/6.2.2/7.4/8.1/8.2/10.2 |
| 采购 | ISO14001:5.3/6.1.1/6.1.2/6.2.1/6.2.2/7.4/8.1/8.2/10.2 |
| 销售 | ISO14001:5.3/6.1.1/6.1.2/6.2.1/6.2.2/7.4/8.1/8.2/10.2 |
| 人资 | ISO14001:5.3/6.1.1/6.1.2/6.2.1/6.2.2/7.4/8.1/8.2/10.2 |
| 总务设备 | ISO14001:5.3/6.1.1/6.1.2/6.2.1/6.2.2/7.2/7.3/7.4/8.1/8.2/9.1/10.2 |