| (J1) | Job 1 | 整车投产 |
| 2/4-WD | Two/Four Wheel Drive | 2/4轮驱动 |
| APQP | Advanced product Quality Planning | 先期产品质量规划 |
| BOM | Bill Of Material | 物料清单 |
| CPA | Commercial and Program Agreement | 商务项目协议 |
| DB | Durability Build | 样车阶段 |
| DFMEA | Design Failure Mode Effect Analysis | 潜在失效模式及后果分析设计 |
| DV | Design Verification | 设计验证 |
| DVP | Design Verification Plan | 设计验证计划 |
| ED&T | Engineering Development and Test | 工程开发和测试 |
| FDJ | Final Data Judgement | 最终资料评价 |
| FEC | Final Engineering | 最终工程完成 |
| FMEA | Failure Mode Effect | 故障模式影响分析 |
| FMEA | Failure Mode Effect | 潜在失效模式及后果分析 |
| FPDS | Ford product Development System | 福特产品开发系统 |
| FRG | Ford Reliability Guideline | 福特可靠性指导 |
| FtF/F2F | Face To Face | 面对面会议 |
| GPDS | Global Product Development System | 全球产品开发体系 |
| GYR | Gree-Yellow-Red | 绿-黄-红 |
| IPD | In Plant Date | 进厂日 |
| IPO | Individual Part Order | 单个零件订单 |
| ISIR | Initial Sample Inspection Report | 初始样件检查报告 |
| JIT | Just In Time | 及时 |
| KO | Kick-Off | 启动 |
| LR | Lunch Readiness | 发布准备 |
| LS | Lunch Support | 发布支持 |
| MP1 | Mass Production 1 | 量产1 |
| MPV | Multi-Purpose Vehicle | 多用途汽车 |
| MRD | Material Required Date | 物料要求到厂日 |
| MRO | Maitenance,Repair and Operation | 维护、修理和运行 |
| MSA | Manufacturing Site Assess | 制造现场审核 |
| MTP | Make To Print supplier | 照图加工供应商 |
| N/A | Not Applicable | 不适用 |
| NTEI | New Tooled End item | 全新开模产品 |
| OEM | Original Equipment Manufacturer | 设备最初制造商 |
| OTS | Off-Tooling-Sample | 完全工装样件 |
| OTT | OK TO TOOL | 可以开模 |
| PA | Program Approval | 项目批准 |
| PDL | Product Design Letter | 产品设计函件 |
| PEC | Preliminary Engineering competion | 初步工程完成 |
| PO | Purchase Order | 采购订单 |
| PP | Pilot Produciton | 试制生产 |
| PP | Production Proveout | 生产验证 |
| PPAP | Production Part Approval Process | 生产件批准流程 |
| PPM | Parts Per Million | 零件的百万分比率(适用于供应商不合格零件) |
| PPSR | Product Prepare Status Report | 产品准备状态报告 |
| PPV | Pre-Production Validation | 产品预先验证 |
| PQA | Process Quality assurance | 过程质量保证 |
| PSW | Parts Submission Warrant | 零件提交保证书 |
| PT | Product Trial | 试生产 |
| PTC | Program Target | 项目目标整合 |
| PV | Production Validation | 产品验证 |
| QOS | Quality Operating System | 质量运作体系 |
| QR | Quality Reject | 质量拒收 |
| RFQ | Request For Quotation | 询价 |
| SA | Sourcing Agreement | 选点协议 |
| SOP | Standard Operation Precess | 标准操作程序 |
| SOP | Standard Operation | 批量生产 |
| SQA | Supplier Quality Assurance | 供应商质量保证 |
| SUV | Sports Utility Vehicle | 运动型汽车 |
| TKO | Tooling Kick-Off | 工装启动 |
| TS-16949 | Technical Specification- 16949 | 技术规范-16949 |
| TT | Tooling Trial | 工装治具测试 |
| TTO | Tool Try-Out | 工装设备试运行 |
| VO | Vehicle Operation | 主机厂 |
| VP | Verification Prototype | 样件验证 |
| VPP | Vehicle Program Plan | 整车项目计划 |