In a debate and looking for feedback
We mold plastic parts, we have an inspection drawing that we created from the mold designed drawing indicating control dimensions that will be monitored.
We create inspection plans to match this drawing. It has been standard practice that the drawing and the plan match.
If we have a tolerance of ± .010" and we inspect a part at 1st pIECe inspection and it's on the low end of the allotted tolerance there is a likely hood that the part will shrink out of dimension. (Matl PP). We want to tighten the tolerance on the inspection plan without changing the inspection drawing. Is this bad practice?
Also is there anything I could reference (Juran's, Quality Tech handbook?)