品质协会(www.PinZhi.org)

 找回密码
 加入协会

QQ登录

只需一步,快速开始

查看: 5920|回复: 9

常用的汽车行业质量工程术语缩写 Glossary of Terms

[复制链接]

10

主题

156

回帖

0

精华

品质协会高级会员

Rank: 4

积分
5454
品质币
5288
职位
1
居住地
湖北省
发表于 2017-8-30 12:34:22 | 显示全部楼层 |阅读模式
一些简单的缩写,个人觉得还行,分享出来看看。

AAR: Appearance Approval Report 外观批准报告

A/D/V: Analysis/Development/Validation 分析/开发/验证

A/D/V–DV: ADV Design Validation  ADV设计验证

A/D/V P&R:  Analysis/Development/Validation Plan and Report.  This form is used to summarize the plan and results for validation testing.  Additional information can be found in the GP-11 procedure.分析/开发/验证计划和报告

A/D/V–PV: ADV Product Validation  ADV产品验证

AIAG: Automotive Industries Action Group, an organization formed by General Motors, Ford and Daimler-Chrysler to develop common standards and expectations for automotive suppliers. 汽车工业行动集团

AP: Advance Purchasing  先期采购

APQP: Advanced Product Quality Planning  产品质量先期策划

APQP Project Plan: A one-page summary of the SGM APQP process that describes the tasks and the timeframe in which they occur.  APQP项目策划

AQC:  Attribute Quality Characteristic  属性质量特性

ASQE: Advanced Supplier Quality Engineer 先期供应商质量工程师

BIW: Body in White. Usually the bare metal shell of the body including doors and deck lid prior to paint and trim. 白车身

BOM:  Bill of Materials  材料清单

BOP:  Bill of Process  过程清单

Brownfield Site:  An expansion of an existing facility.  扩建场地

CMM:  Coordinate Measuring Machine  三坐标测试

CPK: Capability Index for a stabile process  过程能力指数

CTC: Component Timing Chart (DRE document)  零部件时间表(DRE文件)

CTS: Component Technical Specifications  零部件技术规范

CVER: Concept Vehicle Engineering Release  概念车工程发布

DC: Design Complete  设计完成

Defect outflow detection:  A phrase used in the Supplier Quality Statement of Requirements that refers to in-process or subsequent inspection used to detect defects in parts.  缺陷检测

DFM/DFA: Design for Manufacturability / Design for Assembly  可制造性/可装配性设计

DFMEA: Design Failure Modes and Effects Analysis.  It is used to identify the potential failure modes of a part, associated with the design, and establish a priority system for design improvements. 设计失效模式和后果分析

DPV:  Defects per vehicle  每辆车缺陷数

DR: Documentation Required  DR特性

DRE:  Design Release Engineer  设计释放工程师

DV: Design Validation  设计验证

E&APSP: Engineering & Advance Purchasing Sourcing Process.  工程&先期采购定点程序

EP: E-Procurement  电子采购流程

Error Occurrence Prevention: A phrase used in the Supplier Quality Statement of Requirements that refers to poke yoke or error-proofing devices used to prevent errors in the manufacturing process from occurring. 防错

FTQ: First Time Quality  一次通过质量

GA: General Assembly 总装

GD&T: Geometric Dimensioning & Tolerancing  几何尺寸与公差

SGM: Shanghai General Motors  上海通用汽车

GMAP: General Motors Asian Pacific 通用汽车亚太

GME: General Motors Europe 通用汽车欧洲

GMNA: General Motors North American 通用汽车北美

GP: General Procedure 通用程序

GPDS: Global Product Description System  全球产品描述系统

GPS: Global Purchasing System   全球采购系统

GPSC: Global Purchasing & Supplier Chain  全球采购及供应链

GR&R: Gage Repeatability and Reproducibility  检具重复性及再现性

Greenfield Site: A new supplier facility that is built to support a program.

GVDP: Global Vehicle Development Process  全球整车开发流程

IPTV: Incidents per Thousand Vehicles  每千辆车故障

IVER: Integration Vehicle Engineering Release  集成车工程发布

KCC: Key Control Characteristics.  It is a process characteristic where variation can affect the final part and/or the performance of the part.  关键控制特性

KCDS: Key Characteristic Designation System  关键特性指示系统
Kick-Off Meeting: The first APQP supplier program review. 启动会议(第一次APQP供应商项目评审)

KPC: Key Product Characteristic.  It is a product characteristic for which reasonably anticipated variation could significantly affect safety, compliance to governmental regulations, or customer satisfaction. 关键产品特性

LAAM: (General Motors) Latin American, Africa & Meddle East  (通用汽车)拉丁美洲、非洲及中东

LCR: Lean Capacity Rate.  It is the GM daily capacity requirement. 正常生产能力

MCR: Maximum Capacity Rate. It is the GM maximum capacity requirement.  最大生产能力

MOP: Make or Purchase  制造/采购

MPC: Material Production Control  物料生产控制

MPCE: Material Production Control Europe  欧洲物料生产控制

MRD: Material Required Date; date material must be delivered in order to allow a build event to begin.  物料需求日期

MSA: Measurement Systems Analysis  测量系统分析

MVBns: Manufacturing Validation Build non-saleable  非销售车制造验证

MVBs: Manufacturing Validation Build saleable  销售车制造验证

NBH: New Business Hold  停止新业务

N.O.D.: Notice of Decision  决议通知

OEM: Original Equipment Manufacturer  主机客户

PAD: Production Assembly Documents  生产装配文件

PC&L: Production Control & Logistics  生产控制&物流

PDT: Product Development Team  产品开发小组

PFMEA: Process Failure Modes and Effects Analysis.  It is used to identify potential failure modes associated with the manufacturing and assembly process. 过程失效模式和后果分析

PPAP: Production Part Approval Process  生产件批准程序

PPK: Performance index for a stable process  过程能力指数

PPM: 1) Program Purchasing Manager, 2) Parts per Million (rejects and returns to suppliers)  1)项目经理 2)每百万件的产品缺陷数

PPV: Product & Process Validation  产品及过程验证

PQC: Product Quality Characteristic  产品质量特性

PR/R: Problem Reporting & Resolution  问题报告及解决

PSA: Potential Supplier Assessment, a subset of the Quality System Assessment (QSA) 潜在供应商评审

PV: Product Validation  产品验证
QSA: Quality System Assessment  质量体系评审

QSB: Quality Systems Basics 质量体系基础

QTC: Quoted Tool Capacity  工装报价能力

RASIC: Responsible, Approve, Support, Inform, Consult  负责、批准、支持、通知、讨论

R@R: Run at Rate 按节拍生产

RFQ: Request For Quotation  报价要求

RPN: Risk Priority Number related to FMEA development  风险顺序数

RPN Reduction Plan: An action plan that describes what is being done to reduce the risk priority number for items listed in the DFMEA or PFMEA.  降低RPN值计划

SDE: Supplier Development Engineer  供应商开发工程师

SFMEA:  System Failure Mode and Effects Analysis  系统失效模式分析

SMT: System Management Team  系统管理小组

SOA: Start of Acceleration  加速开始

SORP: Start of Regular Production  正式生产

SOR: Statement of Requirements  要求声明

SPC: Statistical Process Control   统计过程控制

SPO:  (General Motors) Service and Parts Operations  (通用汽车)零件与服务分部

SQ:  Supplier Quality  供应商质量

SQE: Supplier Quality Engineer  供应商质量工程师

SQIP: Supplier Quality Improvement Process  供应商质量改进过程

SSF: Start of System Fill  系统填充开始

SSTS: Sub-system Technical Specifications  子系统技术规范

Sub-Assembly / Sub-System: An assembly of sub-components delivered to the SGM main production line for installation to the vehicle as a single unit.   

Subcontractor: The supplier of a sub-component to a Complex System/Subassembly supplier (Tier 2, 3, etc). 分供方

SVE: Sub-System Validation Engineer  子系统验证工程师

SVER: Structure Vehicle Engineering Release. 结构车工程发布

Team Feasibility Commitment:  An AIAG APQP form that is provided with the Request for Quotation.  It is the supplier’s concerns with the feasibility of manufacturing the part as specified.  小组可行性承诺

TKO: Tooling Kick-Off  模具启动会议

UG: Unigraphics  UG工程绘图造型系统

VLE: Vehicle Line Executive  车辆平台负责人

VTC: Validation Testing Complete  验证试验完成
VAC:Vender Action Center 供应商行动中心。 设置在总装现场,处理装配过程中发现的和整车Audit发现的供应商质量问题

WO: Engineering Work Order  工程工作指令

常用缩写.zip

33.36 KB, 下载次数: 52

1. 问答、交流探讨的帖子,回帖时,请不要发纯表情等无价值回帖,无意义,太多了影响用户体验,经常这样账号会被扣分甚至禁号的;
2. 品质协会是个学习、交流分享的平台,所有资料和内容归作者和版权方所有,需要正版标准、资料的请去相关的官方网站等平台购买。

0

主题

26

回帖

0

精华

品质协会中级会员

Rank: 3Rank: 3

积分
1500
品质币
1474
职位
3
发表于 2017-8-30 14:08:00 | 显示全部楼层
谢谢LZ分享,对应海外客户可以用到~
您需要登录后才可以回帖 登录 | 加入协会

本版积分规则

《品质协会规则》|品质币|手机版|品质B2B|联系我们|注册加入协会|品质协会(www.PinZhi.org) |网站地图

GMT+8, 2024-11-18 00:37 , Processed in 0.060337 second(s), 6 queries , Gzip On, Redis On.

Powered by 品质协会 © 2010-2024

品质人,让生活和环境变得更美好!!!

快速回复 返回顶部 返回列表